Q: What is a water filling production line and what equipment does it include?
A: A water filling production line is a complete turnkey system that turns raw water into packed, palletised bottled water. A standard Luye line runs in five stages: water treatment (RO) → PET bottle blowing → air conveyor → 3-in-1 rinsing-filling-capping machine → cap elevator → inkjet coder → labelling machine → shrink wrapper or carton packer → palletiser. If you already own blowing or palletising equipment, we leave those units out and quote the rest of the line.
Q: What capacity (BPH) do I need for my bottled water plant?
A: Work backwards from your daily output: BPH ≈ daily bottles ÷ working hours × 1.2 (safety margin). Our standard small-bottle range covers 3,000 / 6,000 / 12,000 / 24,000 / 36,000 and 48,000 BPH; 3–10 L bottles run at 600–4,000 BPH, and 3-gallon & 5-gallon barrels at 100–1,200 BPH. Tell us your target daily output and shift pattern and we will size the line for you.
Q: What bottle sizes can your water filling lines handle?
A: Three standard configurations: PET bottles from 350 ml to 2 L on a rotary 3-in-1 monoblock at 3,000–48,000 BPH; 3 L to 10 L bottles on a linear line at 600–4,000 BPH; and 3-gallon (11.3 L) and 5-gallon (18.9 L) returnable barrels at 100–1,200 BPH.
Q: What water sources can the RO water treatment system handle?
A: Municipal water, borehole and well water, spring water and surface water. Our reverse osmosis systems run from 0.5 to 50 T/H with 97–99% salt rejection, using SUS304 frames and an open design that makes membrane flushing and maintenance easy. We recommend a full water analysis (TDS, hardness, iron, manganese, silica, bacteria) before we size the treatment section.
Q: How much does a water filling production line cost?
A: Price is driven by three things: capacity, automation level and how much of the line you need. A 3,000–6,000 BPH small-bottle line sits in a very different bracket from a 24,000 BPH turnkey project with blowing and palletising. Send us your target BPH, bottle sizes and water analysis, and we will come back with a costed layout and a budget quotation — usually within 1–2 working days.
Q: What is your lead time from order to shipment?
A: For a complete turnkey line, production and in-house testing take about 45–60 days after deposit receipt and drawing approval. Single machines and standard models ship faster. The exact schedule is written into the contract, and we send weekly production photos so you can track progress.
Q: Do you provide installation, commissioning and operator training?
A: Yes. Our engineers travel to your site for mechanical and electrical installation, commissioning and hands-on operator training, and stay until the line runs at rated capacity. Typical on-site time is 2–4 weeks depending on line size and site readiness. We also send a pre-installation checklist so your piping and electrical work is finished before we arrive.
Q: What warranty and after-sales support do you provide?
A: 12 months from commissioning for the whole machine, with wearing parts excluded. Beyond that we provide lifetime technical support, remote diagnostics, and spare parts shipped from our Zhangjiagang stock, with a response within 24 hours on working days.